Estimate
Proposal #1032
Date: Jun 16, 2017
Expires: Jul 16, 2017

Proposed Product Specifications for An Example Project

Prepared by Estimator: Shaun Podenak

Work Site Address
100 N Ashley Dr
Tampa, FL 33609


Work Type: Swinging Shower Doors

Work Type Budget | 0.0 Total Man-Days to Complete (0 Hours)

Activity DurationsDurationLevelNumberCost Budget
Manufacturing Labor0 min3602010000$0.00
Field Labor0 min3602020000$0.00

Work Type: Wall Mounted Mirrors

Work Type Budget | 0.9 Total Man-Days to Complete (7 Hours)

Activity DurationsDurationLevelNumberCost Budget
Manufacturing Labor0 min3602010000$0.00
Field Labor424.5 min3602020000$471.67
Storefront Frame Installation424.5 min4602020200$471.67
SF: Receptor Installation424.5 min5602021002$471.67

Work Type: 1/2" Tempered Glass Standoff Railing

Work Type Budget | 0.0 Total Man-Days to Complete (0 Hours)

Activity DurationsDurationLevelNumberCost Budget
Manufacturing Labor0 min3602010000$0.00
Field Labor0 min3602020000$0.00

Work Type: Top and Bottom Captured, Channel Glazed Interior Systems

Work Type Budget | 0.1 Total Man-Days to Complete (1 Hours)

Activity DurationsDurationLevelNumberCost Budget
Manufacturing Labor4.5 min3602010000$5.00
Storefront/Curtain Wall Manufacturing Labor4.5 min4602011000$5.00
Fabricate Material After Cutting4.5 min5602010102$5.00
Field Labor62.416666666666664 min3602020000$69.35
Storefront Frame Installation57.25 min4602020200$63.61
SF: Receptor Installation27.25 min5602021002$30.28
SF: Frame Installation | Allowance Per Mullion30 min5602021004$33.33
Glazing Labor5.166666666666667 min4602020400$5.74
Vinyl | Install Vinyl in Field5.166666666666667 min5602020403$5.74

Work Type: Aluminum Framed Storefronts and Entrances, Non-Impact Resistant, for Non-Insulating Glazing

Work Type Budget | 4.6 Total Man-Days to Complete (37 Hours)

Activity DurationsDurationLevelNumberCost Budget
Manufacturing Labor901 min3602010000$1,001.11
Storefront/Curtain Wall Manufacturing Labor901 min4602011000$1,001.11
Cut Material on Cut List146 min5602010101$162.22
Fabricate Material After Cutting379 min5602010102$421.11
Assemble Frame Sections at Shop376 min5602010103$417.78
Field Labor1330.6875 min3602020000$1,478.54
Storefront Frame Installation1085 min4602020200$1,205.56
SF: Layout270 min5602021001$300.00
SF: Receptor Installation120 min5602021002$133.33
SF: Frame Installation | Allowance Per Mullion100 min5602021004$111.11
SF: Frame Installation | Allowance for Frame Height595 min5602021005$661.11
Glazing Labor245.68750000000003 min4602020400$272.99
Vinyl | Install Vinyl in Field245.68750000000003 min5602020403$272.99